Client
Spartan Construction
Project scope
Major upgrade to increase plant’s capacity to treat wastewater and accommodate ongoing and future growth in Kinloch.
Location
Kinloch, Waikato

Kinloch Wastewater Treatment Plant Upgrades

Falcon were responsible for the electrical design, installation and commissioning of the new plant.

The major elements of this project include:  

  • New Main Switch Room (electrical room as part of the blower building)  
  • Sewage Delivery and Storage  
  • WAS Tank 1 and 2 and WAS Pump Station  
  • Inlet Works System 1 and 2  
  • Aeration Blowers  
  • Conversion of SBR2 to Bioreactor 2  
  • Membrane System  
  • Chemical Dosing System   
  • Foul Air Biofilter  
  • Recycled Water System  
  • Compressed Air System  
  • Irrigation System (existing)  
  • Existing MCC board  
  • Provision of future expansion

The team completed the project to a high standard and received very positive feedback on their work.