Client
Spartan Construction
Project scope
Major upgrade to increase plant’s capacity to treat wastewater and accommodate ongoing and future growth in Kinloch.
Capabilities & Services
Location
Kinloch, Waikato
Kinloch Wastewater Treatment Plant Upgrades
Falcon were responsible for the electrical design, installation and commissioning of the new plant.
The major elements of this project include:
- New Main Switch Room (electrical room as part of the blower building)
- Sewage Delivery and Storage
- WAS Tank 1 and 2 and WAS Pump Station
- Inlet Works System 1 and 2
- Aeration Blowers
- Conversion of SBR2 to Bioreactor 2
- Membrane System
- Chemical Dosing System
- Foul Air Biofilter
- Recycled Water System
- Compressed Air System
- Irrigation System (existing)
- Existing MCC board
- Provision of future expansion
The team completed the project to a high standard and received very positive feedback on their work.
View the gallery